Skip Navigation
Falvey Library
Advanced
You are exploring: Home > Blogs

Renovation Review: Phase One Construction

On Monday, Aug. 22, surveyors and contractors began working on the second floor “Learning Commons in Falvey” project, which will eventually bring together academic research librarians and staff from the mathematics lab, learning support and writing center into one unified space.

The book collections that were once housed on that floor have been moved to Falvey West, a section of Old Falvey Hall that was refurbished over the summer. The entrance to Falvey West is on the first floor of Falvey Library and can be freely accessed by patrons who wish to browse and retrieve books in the A – DX call number ranges.

“The first day or two of work involved site assessment and the development of a project sequencing plan by the contractors themselves,” according to Joe Lucia, University librarian. Demolition and infrastructure work will take place over the next few weeks with louder work taking place between midnight and 6:00 a.m. “Scheduling work this way will minimize the impact of construction noise on the library study and work environment,” said Lucia. (Watch a video of the marble slab removal below.)

The Special Collections room will be sealed off from the rest of the second floor in order to protect the valuable collections from dust.  The elevator and stairwells will be blocked off at the second floor to prevent unauthorized entrance and to protect library patrons.

As always, library staff can be called upon for assistance and information. Our aim is to provide a comfortable and accessible work and study space throughout construction.

(Previous blog posts about the renovations can be found here.)

Photo by Alice Bampton – Video by Joe Lucia


Like

0 Comments »

No comments yet.

RSS feed for comments on this post. TrackBack URI

Leave a comment

 


Last Modified: August 24, 2011

Ask Us: Live Chat
Back to Top